Wood, Vinyl, Metal and Composite Fence Types
Materials use different panels, posts and hardware. Send photos/product information so a repair or installation is tied to the actual system. Custom metal/security fencing and masonry walls are outside a generic residential-fence claim.
New Fence vs Section Repair
A single damaged panel or gate can be materially different from setting a new line of posts around a property. New-fence work can involve excavation, concrete, property lines and contractor requirements. Review those requirements before the installation scope and schedule are confirmed.
Posts, Panels, Gates and Alignment
Loose posts, sagging gates and damaged panels each have different repair paths. If a post or footing has failed, replacing only the panel may not solve the problem. Photos should show the complete bay and adjacent posts.
Property Lines, Height and Site Conditions
Do not assume a visible fence line is the legal property line. The website cannot provide survey or legal boundary determinations. Height and location rules can also depend on property conditions.
NYC HIC, Landmark and Permit Considerations
Landmark status or unusual property conditions may affect approvals. Confirm property boundaries, product dimensions and applicable building requirements before fence work is scheduled.
Fence Repair vs Painting or Staining
Coating-only work uses Fence Painting & Staining. Broader wood elements may use Exterior Carpentry. Masonry bases need a separate assessment of their material and condition. Use Contact for preliminary scope review, with full property/fence photos.
Before Fence Scope Is Considered
Provide total linear footage, fence height, material, number of gates and photos of posts at ground level. For repair, mark the exact failed sections. For new fence, state whether a survey/property-line determination already exists. If new posts require excavation/concrete or the property is landmarked, those requirements must be reviewed before the installation scope is confirmed.
Parts of this project may require a licensed, structural or specialist provider. Confirm the work and provider responsibilities before scheduling.
