Refresh vs Full Kitchen Renovation
A backsplash, hardware or countertop refresh can retain much of the current kitchen. Moving cabinets, a sink, major appliances or an island changes the scope and may require design and utility coordination before ordering begins.
Layout and Storage Goals
Cabinet runs and islands affect circulation, door and drawer clearance, appliance access and usable work surfaces. Review those dimensions together so the layout supports the way you cook and use the room.
Cabinets, Countertops and Backsplash
Cabinet dimensions, countertop measurements and backsplash details need to align. Custom cabinetry and stone fabrication involve specialist measurements and production; confirm selections and lead times before setting the installation sequence.
Appliance Integration
Built-in appliances need correctly sized openings and compatible power, gas, water and ventilation connections. Installing equipment at existing connections differs from moving those connections as part of a remodel. Confirm appliance specifications before finalizing cabinetry.
Plumbing, Electrical and Ventilation
Changes to plumbing, electrical supply or ventilation need appropriately qualified trades and any applicable approvals. Coordinate this work before cabinets, counters and finishes make the connections difficult to reach.
NYC Building, Co-op/Condo and Permit Boundaries
Check building-management, co-op or condo requirements early, including access and alteration approvals where applicable. Agree on design, trade and permit responsibilities before construction. Explore Kitchen services for individual components and call the number in Contact details to discuss the whole project.
Confirm appliance specifications, utility locations and key measurements before ordering fitted components. Coordinate rough-in work and any approvals before installing cabinets, countertops and finished surfaces.