Wall vs Ceiling Drywall
Ceilings can require different board handling/support than walls. Provide dimensions and framing spacing/condition when safely visible.
Board Thickness and Moisture-Resistant Options
Board type should match the application and applicable requirements. The page does not provide one universal thickness or wet-area specification.
Existing Framing and Openings
Framing should be suitable, plumb enough and complete before board installation. New structural walls/headers are not ordinary drywall scope.
Cutouts Around Electrical or Mechanical Items
Boxes, pipes, ducts and access panels should already be properly located by qualified trades. Drywall work does not relocate them.
Taping and Finishing After Hanging
Finishing can connect to Drywall Finishing and should be specified as included or separate.
When New Framing or Rated Assemblies Change Scope
Fire-rated assemblies, permitted partitions and MEP relocations need appropriate design/trade/contractor review. Use Wall Installation & Finishing for broader partition intent, and Contact with framing/site details.
Parts of this project may require a licensed, structural or specialist provider. The page keeps those boundaries explicit.
